Before buying a machine, find out how much capacity the plant already has but loses to downtime, scrap and slow changeovers. It is often more than the machine would add.
Do we need a new machine, or are we losing the capacity we already have?
When demand grows, the usual answer is more equipment. But a plant’s effective capacity is its nameplate capacity reduced by downtime, setups, speed losses and scrap. Recovering a few points of each can add as much as a new machine, for much less.
This is a framework for evaluating capacity, not an investment recommendation.
Effective capacity is built from several factors:
Capacity improvements come from raising each factor, not just from buying equipment.
Illustrative A simple illustration, with invented numbers: nameplate capacity of 1,800 thousand units, availability of 85% and yield of 95% gives effective capacity of about 1,453 thousand units. Raising availability to 90% gives about 1,539 thousand, an extra 86 thousand units, without buying anything.
In the synthetic plant, Calculated units produced were 1,545 thousand, and downtime grew 35.5% to 4,200 hours. Scrap and rework rose to 5.7% of production cost. Both are losses of the kind that a capacity review would try to recover.
Calculated In the scenario, a 1% change in volume is worth about $262K. The 86 thousand units in the illustration are about 5.5% of current output, so if they could be sold they would be worth roughly $1.4 million a year. Information gap Nameplate capacity, availability and demand are not in the demo, and purchase quotes are needed to compare. The comparison matters: recovering lost capacity usually costs less than buying new capacity of the same size.
4. Explore the interactive experience
Manufacturing Performance Dashboard: a product-line dashboard with downtime and scrap, a scenario simulator for volume, price, materials and scrap, evidence-linked answers from APIS, and a sample brief, all on synthetic data.
The experience below is built on a synthetic manufacturer, “Demo Components Inc.,” analyzed by product line. It has no station-level, machine-level or line-level records, so product lines are used to show the method. Nothing in it is real.
Recovering capacity often comes before buying it.
Two Pillars can help manufacturers investigate production performance, cost structure, inventory and capital investment decisions using your own plant data. A good first step is a capacity audit that finds lost capacity before any equipment is purchased.